Sl. No. Location Scope of Works Associated With Project Specs Status
1 Gumupundi Erection, Testing, Commissioning of Boiler, Rotating Machines and Auxliries. Ansaldo Caldie Boiler (P) Ltd. (OPG Power Generation (P) Ltd, Chennai ). 1 X 80 MW Completed
2 Nellore A.P. Erection, Testing & Commissioning of Complete Rotating Machines,,including (FD,PA,ID FANS COAL). DSTPP- Nellore, Andhra-Pradesh. 1 x 800 MW Completed
3 Korba –West Erection, Testing, Commissioning of Complete Rotating Machines Including, FD FAN,IDFAN,PA FAN Coal. CSPGL,Korba- West C.G. 2 X 250 MW Completed
4 Korba -Patadi, C.G. Erection, Testing, Commissioning of Complete Rotating Machines Including. LANCO, Amarkantak. 2 x 650 MW Completed
5 Madwa, (C.G.) Erection, Testing, Commissioning of OFF Sites Pumps. BGR Power Energy 2 X 500 MW Completed
6 Krishnapatnam,,A.P Erection, Testing, Commissioning of OFF Sites Pumps & LP Pipings. BGR Power Energy 2 X 600 MW Completed
7 Amaravati, M.H. Erection of Insulation & Clading of Boiler ESP & Pipings. India Bulls 2 X 270 MW Completed
8 Korba C.G. Erection of Mill & Fans. Balco – Vedanta 540 MW Completed 4 x 300 MW Completed
9 SIPAT Erection Testing & Commissioning, of Trial Operation & PG Test, Ash Handling System. NTPC-SIPAT,Bilaspur C.G. 3 x 660 MW Completed
10 Madwa Erection, Testing, Commissioning of Complete Rotating Machines Including FD FAN,ID FAN, PA FAN . C.S.E.B. - Madwa, C.G 2 x 500 MW Completed
11 Talcher, Orissa Erection & commissioning services of NTPC, TTPS U#2 (R&M FOR BOILER 1X62.5 MW Talcher TPS). NTPC/TTPS, Talchar, (Orissa) C/o. Mitsui Babcock Energy (India) Pvt. Ltd. 1 x 62.5 MW Completed
12 Talcher, Orissa Dismantling of start-up Boiler at Korba STPP, Transportation to Talcher Site, Erection, Testing and Commissioning of the same at Talcher STPP, Talcher, Orissa. NTPC/KSTPP Start Up- Boiler Completed
13 Talcher, Orissa Handling at site store/storage yard transportation to Site of work, Erection, Testing and commissioning supply & application of final painting of rotating equipment including erection of ID system ducting and structure of Unit#3&4 of 4x500mwTalcher, Kaniha Orissa. NTPC/TSTPP, KANIHA 4 x 500 MW Completed
14 Bhusawal Erection, Testing & Commissioning Trial Operation & PG test, Ash Handling System at (2x500MW). Techpro Ashtech Ltd., Bhusawal (Maharastra) 2 x 500 MW Completed
15 Mundra Erection testing commissioning of Mills & Fans & Air-Pre-Heater U#1 & U#3 (5X800 MW). DPIL-Mundra, 5 x 800 MW Completed
16 Korba Erection, Testing & Commissioning of Mills & Fans & Air-Pre-Heater (2X300 MW). Lanco Amarkantak Power Pvt. Ltd., Pathadi, Korba 2 x 300 MW Completed
17 Hissar Erection testing commissioning of Mills & Fans U#1&2 (2 X 600 MW). Hissar Thermal Power Projects, 2 x 600 MW Completed
18 Raghunathpur Erection testing commissioning of Rotating Equipments of Fans, Mill & Coal Feeder (2 X 600 MW) of U#1 & 2. Raghunathpur Thermal Power Plant 2 x 600 MW Completed
19 Jharsuguda Erection of Rotary Equipment , Coal Pipes (including Valves, Elbow, Expansion Joints, Supports) & Ducts of Unit No.1 of Sepco (2 X 600 MW). SEPCO Thermal Power Plant C/o. Tata Projects Ltd., Jharsuguda, Orissa 2 x 600 MW Completed
20 Bilaspur Erection commissioning of Mills & Fans (2X500 MW). NTPC/Sipat, Bilaspur 2 x 500 MW Completed
21 Korba Erection testing commissioning of Mills & Fans & Air-Pre-Heater (1 X 500 MW). NTPC, Korba Completed
22 Korba Erection commissioning of Mills & Fans (2X250 MW), Unit#1 & 2 at CSEB, Korba (East). CSEB, KORBA (EAST) 2 x 250 MW Completed
23 Talcher, Orissa NTPC Talcher STPP Stage-I, U#2 500MW Overhaul of Boiler Pr. Parts & all connected works. BHEL, Secunderabad (AP) 2 x 500 MW Completed
24 Balco, Korba Erection, Testing & Commissioning Trial Operation & PG Test, Ash Handling System at (4x300MW). Techpro Ashtech Ltd., Balco, Korba (CG) 4 X 300 MW Completed
25 Chennai Handling at site store/storage yard transportation to Site of work, pre assembly Erection, Testing and Commissioning & final painting of 2x30mw (frame-06) Unit#3&4 Gas Turbine, Generators auxiliaries & field piping at Basin Bridge Gas Turbine Power Project, Tamilnadu. BHEL Basin Bridge, Tamilnadu 2 X 30 MW Completed
26 Chakabura, Korba Erection testing commissioning of Fans (2X135 MW) U#1&2. Aryan Coal Benefication 2 X 135 MW Completed
27 Aligarh Erection, Testing & Commissioning Trial Operation & PG Test, Ash Handling System at (4x300MW) . Harduaganj Thermal Power Station 2 x 250 MW Completed
28 Angul , Odisha Erection, Testing & Commissioning of ESP. Jindal India Thermal Power Ltd. 2 x 600 MW Completed